ZarklyX is now in early access. Be the first agency to try.
ZarklyX

Working with the project list

How to read the project cards, find the one you want, and create, edit or remove a project.

Last updated October 23, 2026

What this screen is for ?

This is every project your company is running, one card each. It is the way in to a project - open a card and you get its tasks, its team, its milestones and the rest.

How to get here: open Projects & Development > Projects from the left menu.

New Project at the top right creates one. The heading above the grid tells you how many projects match what you are currently looking at, so it moves as you search and filter.

Reading a project card

Each card carries the whole state of a project at a glance:

  • The logo in the top left, or the project's initials if no logo was uploaded.
  • The status badge in the top right, and next to it the three-dot menu for editing or removing.
  • The name, and under it the first couple of lines of the description. Projects with nothing written show No description.
  • Start and End. Either reads Not added yet if the date was never set - only Start is required when a project is created.
  • A red Delayed by N days line, if the end date has passed and the project is still running. Completed, Cancelled and Archived projects never show it.
  • The progress bar, and the percentage beside it.
  • The faces at the bottom left - the people on the project, up to three, with a +N circle if there are more. Projects with nobody on them say No members assigned.

Where the percentage comes from

The progress bar is not something you type in. It is worked out from the project's tasks: the share of them marked Completed, rounded to a whole number.

So a project sits at 0% until tasks are created on it and start being completed, however much work has actually happened. This is the same figure the project's own dashboard and details page show - they all count the same way, so they should not disagree.

The bar changes colour with the status rather than the number: green once the project is Completed, red if it was Cancelled, grey once Archived.

What the status badges mean

Every project holds one of six statuses, set when it is created and changed by editing it:

  • Planning - the default for a new project. Agreed but not started.
  • Active - being worked on.
  • On Hold - paused, expected to resume.
  • Completed - finished.
  • Cancelled - stopped and not coming back.
  • Archived - kept for the record and out of the way.

Archived is the one that behaves differently: archived projects are hidden from this screen unless you tick Archived in the filters. Nothing has been deleted - it is the tidy-away status, and a safer choice than deleting a project you have finished with.

Opening a project

Click anywhere on a card to open the project. Clicking the three-dot menu does not open it, so you can act on a project without leaving the list.

Clicking the row of faces at the bottom of a card opens the project straight on its Team & Members tab, which saves a step when you only want to know who is on it.

Finding a project

Use the search box above the grid. It filters as you type and matches on four things: the project name, its status, its project type and the name of its owner.

Because it matches the status, typing on hold gives you every paused project, and because it matches the owner you can pull up everything for one client by name.

Search covers all your projects, not just the ones currently on screen. Clear the box to get the full list back.

Filtering the list

Filters at the top right opens a panel with two groups: Status and Project Type. The number on the button counts how many groups are in use, and Clear all inside the panel resets both along with the search box.

Each group takes one choice at a time - ticking a second status replaces the first rather than adding to it. So you can ask for Active projects, or for projects of one type, or for both together, but not for Active and On Hold at once.

Filters and search stack, and the count in the heading is what is left after both.

Seeing more projects

The grid shows six projects to begin with. Show more projects underneath adds another six each time you press it, and disappears once everything matching is on screen.

Searching or changing a filter takes the grid back to the first six.

Creating a project

New Project opens a drawer from the right. Only three things are actually required - Project Name, Project Owner and Start Date - so you can get a project in quickly and fill the rest in later by editing it.

  • Project Logo - click the square to upload a JPG, PNG, WEBP or SVG up to 2 MB. It is held in the drawer and only sent once the project itself saves.
  • Project Name - at least two characters.
  • Project Type - your own list. + Add New Type at the bottom of the dropdown creates one without leaving the drawer, and the new type is selected for you.
  • Project Owner - defaults to your own company, for internal work. Pick a client from the Active Clients group instead when the project is being done for someone.
  • Status - Planning unless you change it.
  • Employees and Team - who is on the project. See the next section.
  • Start Date and End Date. End Date stays locked until a Start Date is chosen, and must be on or after it.
  • Planned Budget and Currency - both optional, and the budget cannot be negative.
  • Description - the rich-text box at the bottom. Its first lines are what shows under the project name on the card.

Create Project saves and closes the drawer; the project appears in the grid straight away.

Employees and Teams are not the same thing

The drawer offers two ways to put people on a project, and they are deliberately different:

  • Assign Employees names individual people. Use it to put one or two specific people on a project.
  • Assign Teams brings a team's whole membership along. + Add New Team at the bottom of that dropdown creates a team on the spot, and each team you pick lists its members underneath so you can see who you have just added.

Either way the person ends up assigned to the project, which is what makes it appear in their own project list. Removing a team from the drawer takes its members off with it.

Clearing the employee picker and saving actually removes those people - the picker is sent on every save, empty or not, so it is not additions only.

Choosing which tabs a project has

Customize tabs for this project decides what the project page carries once it opens.

Dashboard, Tasks, Teams and Information are always on and cannot be switched off - they are greyed out for that reason. Milestones, Documents, Issues and Finance are yours to choose, and all four start off.

Nothing is lost by leaving one off now: turn it on later by editing the project and it appears with whatever has been recorded against it.

Editing a project

Choose Edit from the three-dot menu on a card. The same drawer opens with the project's details filled in, and Update Project saves them.

This is where you move a project through its statuses, extend the end date, change the owner, add or remove people, and turn the extra tabs on.

If the logo will not upload for some reason, the project itself still saves - you get a warning saying so rather than losing the rest of your edit.

Deleting a project

Choose Remove from the three-dot menu and confirm. The dialog names the project.

Read the warning on it properly: deleting a project takes its related data with it, and it is permanent. Tasks, milestones, documents and the record of who worked on what all go.

Most of the time this is not what you want. A project that is finished should be Completed, one that was dropped should be Cancelled, and one you simply do not want cluttering the grid should be Archived - archived projects are hidden here by default but keep their history intact. Delete is for projects created by mistake.

If something does not work

A few things that commonly catch people out on this screen.

  • A project you know exists is not in the grid - either the search box is still filtered, or the project is Archived. Clear the search, then tick Archived in the filters.
  • Ticking a second status replaced the first - that is intended. Status and type each take one choice at a time.
  • End Date will not let you pick anything - it stays disabled until a Start Date is set. Set the start first.
  • A project sits at 0% although work has been done - the percentage counts completed tasks, so it moves only as tasks on the project are completed.
  • Delayed by N days on a live project - its end date has passed. Either extend the date or move the project to Completed.
  • The logo was rejected - it must be a JPG, PNG, WEBP or SVG, and 2 MB or smaller.
  • You saw Project saved, but the logo could not be uploaded - the project is saved. Edit it and try the logo again.
  • People you removed from the drawer are still on the project - they may be there through a team rather than named individually. Remove the team, or check the team's own membership.
  • There is no New Project button, or the three-dot menu will not open - your role does not allow creating, editing or deleting projects. Ask an administrator.