How to read your own performance page ?
Your own My Performance page: how the monthly grade is put together, why a part with no data makes the other parts count for more, and why the numbers keep moving until the month closes.
Last updated October 23, 2026
What this screen is for ?
This is your own performance page: what you got done in a month, how your attendance and meetings looked, and the ratings your managers gave you.
How to get here: open Human Resources > My Performance from the left menu.
There is nothing to fill in and no required fields, because nothing here is saved. The only control on the page is the month at the top right. Every figure is worked out from your tokens, daily works, project tasks, issues, attendance, timesheets, meetings and the ratings you were given, so the way to change a number is to change the underlying record in its own module.
The one thing that surprises people: a part of your grade with no data is not scored zero, it is left out of the grade and its share is handed to the other parts. If nothing is tracking your activity, for instance, that part drops out and your ratings, delivery and attendance carry the whole grade between them. Each part says on its own card what it counted for this month.
Two reasons the page may not be there at all: it appears only once your company has the Performance Reviews module, and it is never shown to the agency owner, because nobody rates the owner.
Choosing the month
Everything on the page belongs to one month. The month picker sits at the top right with an arrow on either side.
- The left arrow steps back one month, the right arrow steps forward one month.
- The picker itself jumps straight to any month.
- All three are greyed out while the page is still loading.
The forward arrow greys out once you reach the month that is still running, because there is no later month to look at yet.
The month you are on becomes part of the page address, so you can copy the link and come back to the same month later. It replaces the address rather than adding to it, so the browser Back button does not walk back through the months you looked at - it takes you off the page. Use the left arrow to go back a month.
Your performance grade
The Performance grade card is one score out of 100 for the month, shown as a letter in a big ring, with the bands printed underneath: A+ is 90 and over, A is 80 to 89, B is 70 to 79, C is 60 to 69 and D is below 60. Hover any ring for the exact score behind it.
The score is made from four parts, each scored out of 100:
- Rating - the average of this month's manager ratings, converted from stars to a score out of 100.
- Delivery - the share of finished work that met its due date, across tokens, daily works, tasks and issues together.
- Attendance - days attended out of working days so far, with approved leave not counted against you, plus arriving on time.
- Activity - the active share of the time the desktop agent tracked during your work hours.
Under each part is the line that matters: it either reads that the part counts for a given percentage of the grade, or that it was left out this month and what it would normally have been worth. That is where you see the shares being redistributed.
If fewer than two of the four parts have data there is no grade at all, and the ring reads that there is not enough data.
The badge in the card header tells you how settled the grade is. So far means the month is still running and the grade will keep moving as work is finished and ratings arrive. Final means the month closed and the grade was frozen, so it will not change again. Not frozen means that month was never frozen and the grade is being worked out from current data.
On the right is the last six months. The line chart appears only once two months have a grade; below it, six small blocks always show each of the last six months, with a dash for any month that has no grade.
Month at a glance
Six tiles summarise the month: tokens completed, daily works completed, tasks completed, issues fixed, attendance and meetings attended.
Every tile is a button - click one to jump down to its section. Tasks completed and Issues fixed both jump to the same Projects section, because tasks and issues are reported together.
The small line under each number is the part worth reading: how much is still pending and how much is overdue. It turns red when something is overdue. The attendance tile reads that you are not on attendance if you are not on the attendance system at all.
A CRM card appears under the tiles only if you had CRM activity this month - leads assigned, deals won, CRM tasks done and CRM tasks overdue. With no CRM activity there is no card, which is not a fault.
When the month has been frozen the tiles are marked as final numbers, and a line underneath warns that the headline numbers are the ones stored when the month closed while the charts and lists below are built from today's data, so the two can differ slightly. While the month is still running the tiles are marked as the month so far.
Tokens, Daily works and Projects
Then comes one section per kind of work. Each one opens with headline numbers, then charts, then the full list of items.
- Tokens - tokens assigned to you in Token & Queue. The clock runs from when the token reached you until you marked your part complete, and this section also shows the hours logged on the token timer.
- Daily works - posts and content work, where the due date is the scheduled publish date. Daily works carry no priority, so the by-priority line is left out here rather than showing all zeros.
- Projects - project tasks and issues from Projects & Development together. A task counts as done when it moves to a done status; an issue when it moves to To Be Tested or is closed. Reopened issues are counted separately rather than being taken off the fixed count.
A section you had no work in says so in a single line instead of showing empty charts.
Watch the charts that group by client or project. They do not show everything. Once you worked for more than six clients in a month, Tokens and Daily works show the busiest five and fold the rest into a single bar called Other; once more than eight projects are involved, the Projects chart shows the busiest seven and folds the rest into Other the same way. The hours logged by project chart shows only the top eight projects and simply leaves out the rest. The project report table underneath lists every project you touched, so use that table when you need the full picture.
Typical time to finish is the middle value, not the average. The average is in the small line underneath it, and in a month with one very long job the two will look quite different.
The lists of items
At the bottom of each work section is the list of the actual items behind the numbers, ordered overdue first, then still open, then finished.
- Tabs across the top filter by state: All, Overdue, In progress, Finished and New this month, each with its own count. New this month means the item reached you during the month whatever state it is in now, so it overlaps the other tabs rather than being a separate pile of work.
- In the Projects list only, a toggle on the right switches between all modules, project tasks and issues. The counts on the tabs follow whichever module you picked, and the counts on the toggle follow whichever tab you are on, so both sets of numbers move as you click around.
- Only 25 rows are shown at a time, with a button under the table to show the rest. Switching a tab or the module toggle puts you back to 25.
- The Result column is the quickest read: on time, late with the number of days, overdue with the number of days, in progress, or no due date. Work with no due date can never be late, which is also why it is left out of the on-time percentage.
Clicking an item name opens it where it lives - a token in Token & Queue, a daily work in the Daily Works scheduler, a task or an issue inside its project. A task or issue that is not attached to a project shows as plain text instead of a link, because there is nowhere to open it.
Attendance and meetings
The attendance section comes from the attendance system and the desktop agent. Working days follow your company work week and holidays, and required hours mean the shift less the break allowance - the same day goal the attendance timer counts down. A half day counts as attended in the attendance percentage.
The hours figures change shape depending on the month. While the month is still running you get how much you are short on the days already over, and how much is left for the rest of the month, with the days still ahead counted as full shifts. Once the month is over those turn into the month's required hours and how much you ended up short.
The day by day table lists every working day so far, newest first, plus any day off you actually worked. A day off you did not work is not listed at all, so gaps in the dates are normal. Today's row reads that it is in progress and is never marked short, because the day is not over. Break time taken past the allowance is called out in red under the break figure.
The chart above the table puts one bar per day with the day number on the axis - hover a bar for the full date - and the line across it is your usual day goal. The legend under it names only the kinds of day that actually occurred that month.
The meetings section covers meetings you organised or were invited to. Attended counts only the ones that were held and ended; scheduled and still-running meetings sit under not held yet, and cancelled meetings stay in the list and still count towards the total number of meetings. Duration is the real length once a meeting has ended, and until then it shows the planned length marked as planned.
Your ratings
A single line at the very top of the page tells you where the month stands for rating: that your managers are rating it until a given date, or that rating opens on one date and closes on another, or that rating for that month is closed. A month can be rated on any day of that month and closes when the month ends, and while it is open a manager can change a rating they already gave - so a score you looked at on the 10th can read differently on the 25th.
Lower down, Your ratings shows the average across everyone who rated you, in stars and as a number out of 5, with how many ratings it came from. Below that is one card per rating.
Ratings here are not anonymous. Each card shows who rated you, their picture, the date, their overall stars, their stars for each criterion, and their comment if they left one.
Three things to know:
- The date reads as when the rating was given, but it is the date it was last changed. A manager revising their rating moves that date.
- If a criterion was added to the rating form after a manager rated you, their card shows that criterion as zero stars rather than as blank. An older rating can therefore look worse than it was meant to be.
- The heading says the average counts for 40% of your grade. The grade card above shows the share it actually carried, which is higher than 40% whenever another part was left out for lack of data.
You cannot reply to a rating or remove one from this page - there is no control for it here. With no ratings yet, the section says so and explains that managers can rate you any day of the month and change it until the month ends.
If something does not work
A few things that commonly catch people out on this screen.
- The page says there is no employee profile - ratings are given to employees and your login is not linked to an employee record. Ask whoever manages your employees to link it; nothing on this page can work until they do.
- My Performance is not in the left menu - it appears only when your company has the Performance Reviews module, and it is never shown to the agency owner.
- A message says your ratings could not be loaded - the page failed to fetch them. Reload the page, and if it keeps happening report it rather than reading the empty page as a real result.
- Your grade reads that there is not enough data - a grade needs data for at least two of the four parts. One part on its own is not graded.
- A part says it was left out this month - it had no data at all, so its normal share went to the other parts. Your grade is made of fewer things than usual, which is worth knowing before comparing it with last month.
- A part reads no data although you did the work - that part draws on another system. Attendance needs you to be on the attendance system and Activity needs the desktop agent; without them there is nothing to score.
- The grade changed since you last looked - while the month is running it is marked as the month so far and updates as work is finished and ratings arrive. It stops moving when the month closes and is marked final.
- The headline tiles do not match the lists below them - on a frozen month the tiles are the numbers stored at month end, while the charts and lists are built from today's data.
- The six-month chart is missing - it appears only once two months have a grade. The small blocks underneath still show what there is.
- A client or project you expected is missing from a chart - it was folded into the Other bar, or it fell outside the top eight on the hours chart. The project report table lists every project you worked on.
- The list is missing rows you know exist - only 25 show at a time. Use the show more button under the table, and remember that switching a tab resets it to 25.
- An item name will not click - a task or issue with no project has nowhere to open.
- The forward arrow will not move - you are already on the month that is still running.
- A rating shows zero stars on one criterion - that criterion was added after the rating was given. It was never scored, rather than scored zero.
- A figure looks wrong - nothing on this page is editable. Correct the token, task, issue or attendance day in its own module and this report follows.
- You want this as a file - there is no export or print button on this screen.