How to read the daily work dashboard ?
What every figure on your monthly daily work dashboard counts, why work is grouped by the month it was scheduled for rather than the month it was created, and which tiles are not fed by anything yet.
Last updated October 23, 2026
What this screen is for ?
This is the one-month summary of your daily work: how much is planned, where each piece has got to, how much is finished, and how long finished work is taking.
How to get here: open Daily Work > Dashboard from the left menu.
It is a read-only page. There is nothing to fill in and no required fields - the month box at the top right is the only control. Every figure is counted from the work your agency has logged for you, so the way to change a number is to change the work itself, which is done on Daily Work > Work Overview.
The one thing to know before you read anything else: a piece of work belongs to the month it is scheduled for, not the month it was created. A schedule drawn up in August for September work counts entirely against September. And work that has no scheduled date at all is counted in no month, so it does not appear anywhere on this page, for any month you pick.
There is also no refresh button here. To pull fresh figures, pick the month again or reload the browser page.
Choosing the month
The box at the top right sets the month the whole page reports on. It starts on the current month.
Click it and it opens straight onto a grid of twelve months. The arrows either side of the heading move a whole year at a time, and clicking the year in the heading gives you a list of years. You cannot type into the box - it is click-only.
Picking a month closes the grid and reloads all four parts of the page at once: the tiles, the analysis card and the chart.
Two things worth knowing:
- Nothing stops you choosing a month in the future or several years back. A month with no work scheduled in it simply shows a page of zeros - that is an empty month, not a fault.
- There is no day, week or date-range option. This page is always one whole calendar month.
The six status tiles
The top row counts your work for the chosen month by the stage it has reached: Total, Pending, Processing, Hold, Changes and Review. While the figures are being fetched you see grey placeholder blocks in their place.
Total counts everything scheduled in the month, in every stage, finished work included. So Total will normally be larger than the five tiles beside it added together - they are five stages out of the full set, not a breakdown of the whole.
All six tiles are clickable, and this is where people are caught out: whichever one you click, you land on the same Daily Work > Work Overview screen with nothing filtered. It does not jump to just the Pending items, and it does not carry across the month you were looking at. Treat the tiles as a quick way through to your work, then filter once you are there.
Completed, Scheduled post and Posted
The three wider cards underneath are the output side of the month, and they do not all behave the same way.
- Completed - how much of the month's work is finished. This one is a real figure.
- Scheduled post - always shows 0.
- Posted - always shows 0.
Those last two are not fed by anything yet, so they read 0 however much work is actually scheduled or published. Do not read them as nothing scheduled and nothing posted - to see that, open Daily Work > Work Overview.
Like the tiles above them, all three cards click through to the Work Overview screen, unfiltered.
Daily work analysis and the completion dial
The card on the lower left splits the month by type of content. The badge beside Total daily work is everything scheduled in the month - the same count as the Total tile at the top.
Under it are two columns of five figures each, and there are no column headings: the colour is the only label. The amber column on the left is work that is not finished, the green column on the right is work that is finished.
The amber column is everything that is not marked completed, which means Processing, Hold, Changes and Review items are all counted in it. That is why its total is usually larger than the Pending tile at the top - Pending is one stage, amber is everything outstanding.
Each column lists Total, Post, Stories, Reel and Festival. Total is all the work in that column; the four below it are by type. Work of any other type is counted in Total but in none of the four, so the four will not always add up to the Total above them.
The dial on the right is the finished share of Total daily work, rounded to a whole percent. It is worked out from this card's own two totals, not from the tiles at the top, so read it against the figures beside it. An empty month shows 0%.
Average resolution time
The chart on the lower right plots one point for every day of the chosen month, with hours up the side. Hover a point to see the figure for that day.
What it actually measures is not obvious: it is the gap between the slot a piece of work was scheduled for and the moment it was marked completed, averaged over the items scheduled on that day. It is not how long anyone spent working on it, and work finished ahead of its slot still shows hours, because the size of the gap is what is measured either way.
Only finished work counts. Each point sits on the day the work was scheduled for, not the day it was completed, and a day on which nothing was completed sits at zero - so a quiet week dips to the bottom of the chart rather than leaving a gap in the line.
The chart redraws whenever you change the month. On a long month the dates along the bottom are thinned out and tilted, so not every day gets its own label.
If something does not work
A few things that commonly catch people out on this screen.
- A month you know had work shows zeros - work is counted by its scheduled date, and anything with no scheduled date is counted in no month at all. Check the schedule on Work Overview.
- The whole page is zeros and there is no error message - the figures failed to arrive and the page says nothing about it. Pick the month again or reload the page. If it keeps happening, your client account may no longer be active, so ask your agency to check it.
- Scheduled post and Posted never move off 0 - nothing feeds those two tiles yet. Use Work Overview to see what is scheduled and what has gone out.
- You clicked Pending and got the whole work list - the tiles do not pass the status or the month across. Filter on the Work Overview screen instead.
- You cannot find a refresh button - there is not one. Pick the month again in the box at the top right, or reload the page.
- The Total tile is bigger than the five tiles next to it added up - Total counts every stage, including finished work.
- The amber total is bigger than the Pending tile - amber is everything not finished, so Processing, Hold, Changes and Review are in there too.
- Post, Stories, Reel and Festival do not add up to the Total above them - work of any other type is counted in the Total only.
- The dial does not match the tiles at the top - it is calculated from the analysis card's own totals, which split the month differently.
- The resolution chart drops to zero in the middle of the month - nothing was completed on those days. Only finished work with a completion time counts.
- The resolution chart shows a smooth even wave with no zero days at all - that is the sample curve the page draws when the real figures do not arrive. Reload the page.
- The month box will not let you type - it is click-only. Click it and use the month grid, or the year in its heading.
- A future month is all zeros - nothing stops you picking it; there is simply no work scheduled there yet.
- The analysis figures sit still while the page is loading - only the tiles at the top show grey placeholders. The lower card keeps the previous numbers until the new ones arrive.