The Work Overview calendar of everything your agency has scheduled for you - how to read the coloured marks on each day, and why the status box beside a comment can change the task itself.

Last updated October 23, 2026

What this screen is for ?

This is the calendar of the work your agency is doing for you: the posts and tasks on your account, each sitting on the day it is due, with the detail of any one of them a click away.

How to get here: open Daily Work > Work Overview from the left menu.

It is mostly a reading screen. You cannot create, edit or delete anything on it, and you only ever see your own work - there is no client to choose, because the page already knows who you are. The one thing you can do is open a task and leave a comment, which is how feedback gets back to the agency. That comment box is the only form here, and it needs either some text or at least one image before it will post.

The surprising part, worth knowing before you use it: a comment can change the task's status. Beside the comment box is a Set Status dropdown, and if you change it before posting, the task really moves to that status and the change is written into its history with your name on it. Leave it alone and your comment is just a comment.

Choosing the month and the day

Two things decide what you are looking at: the month the calendar is on, and the day selected inside it.

Use the controls along the top of the calendar card:

  • Today - jumps back to the current month.
  • The left and right arrows - one month back or forward.
  • The month box inside the calendar card - jump to any month and year.

There is a second month box above the calendar, to the right of the page heading. Only one month is ever selectable in it and every other month is greyed out, so use the calendar's own controls instead - it is not worth fighting.

Moving to another month resets the day you had selected: you land on today when it is the current month, and on the 1st otherwise. Then click any date to fill the panel on the right with that day's work.

Two things this view quietly leaves out. A task with no scheduled date never appears, in any month, because the calendar is built entirely on due dates. And a month is loaded 100 tasks at a time - if your agency has scheduled more than that in one month, the most recently created 100 are the ones you see.

What the marks on each day mean

Days with work on them carry small marks, and nothing on the page explains them:

  • A green square with a number at the bottom of the day - how many of that day's tasks are marked Completed.
  • A red square with a number beside it - how many are not. Anything that is not Completed counts here, whether it is waiting, on hold, in review or being changed.
  • A red triangle in the top left corner of the day - a flag that the day still has something outstanding. It shows whenever that red number is above zero.

So the marks count tasks, not progress or urgency. A day with a big red number is simply a busy day that is not finished yet - it does not mean anything is late. Lateness is shown per task in the panel on the right.

Clicking a date only refills that panel. It does not open anything, and nothing on the calendar itself can be opened.

The panel beside the calendar

This panel is the selected day's worklist.

At the top is your own account - the business name your agency holds for you, with the email underneath - and below it the people working on your account, shown as avatars. Up to four appear, with a plus number if there are more; hover any one of them for a name and role. That is the quickest way to place a name you see on a comment.

Under those is the date on show, and then one card per task:

  • The heading is the type of post, or Untitled post when the agency has not set one.
  • Below it, the first few lines of the description, or No description provided.
  • A status badge on the right - the task's status, or Pending when it has none.
  • Who it is assigned to, with their role, or Unassigned.
  • Due - the scheduled date. It turns red when the date has passed and the task is not finished, and adds (Delayed) when the work was finished after its date.
  • Done - on finished tasks only, green when it was done on time and amber when it was late.
  • Any category and platform tags the agency set, one tag per platform.

Finished tasks sort to the bottom, so whatever still needs attention is always at the top of the list. On a day with nothing scheduled the panel says so and suggests picking another date or another month.

Opening a task - the Info tab

Click a card and Task details slides in from the right, with three tabs: Info, Comments and Timeline. Nothing in it can be edited.

Info carries the type, the status, the scheduled date, who it is assigned to, the same due and done lines as the card, the category and platform tags, and the full description. Copy beside the description copies it as plain text, so any bold, lists or links in it are dropped - it is meant for pasting into a message, not for keeping the layout.

Reference files the agency attached appear at the bottom: images as thumbnails, with a view and a download button when you hover one, and documents as rows with a download button. One oddity to expect - opening a task from the day's list does not bring its attachments with it, so the block can be missing on a task you know has files. It appears once the task has been reloaded, which happens as soon as you post a comment on it.

The cross in the corner and Dismiss at the bottom both simply close the panel; nothing is saved or lost by closing it. If your agency sends you a link about one particular task, that task opens here on its own.

Commenting on a task

The Comments tab is the one part of this screen that does something. It lists every comment on the task, yours and the agency's, oldest first, each with the author, the date and time, any images, and a status badge where that comment changed the status. A strip above the list shows the task's status as it stands.

To add one:

  1. Type your comment in the box at the bottom.
  2. Upload image attaches pictures. Each one shows as a thumbnail, and the bin on a thumbnail removes it before you post.
  3. Decide what to do with Set Status - the next section explains why that matters.
  4. Click Post Comment.

Post Comment stays greyed out until there is either some text or at least one image, so an image on its own is a perfectly valid comment. While pictures upload you get a progress bar, and the comment appears in the list when it finishes.

Attachments have firm limits: at most 10 files per comment and 5 MB each, and only JPG, PNG and WEBP are accepted even though the file picker will happily let you choose any image. One file too large, or in another format such as GIF, and the whole comment fails to post.

What Set Status really does

Set Status sits beside the comment box and offers three choices: Hold, Changes and Completed. It arrives already set to the task's current status, and if that status is something else entirely the box simply looks empty - that is normal.

Leave it as you found it and your comment is a plain comment; the task does not move. Choosing the status it already has does nothing either.

Choose a different one and the task genuinely changes status the moment the comment posts, and the change is recorded in the task's history against your name. Use Changes when you want something reworked, Hold to pause it, and Completed only when you are happy with the work.

Two cases are refused - and the refusal takes the whole comment with it:

  • The post has already gone out. The task counts as closed and its status cannot be moved.
  • The post is scheduled and waiting to publish. That has to be dealt with by the agency first.

Nothing tells you this has happened: the button goes back to Post Comment, no comment appears, and your text is still sitting in the box. The way through is to put Set Status back as it was and post the comment on its own, then ask the agency to make the change.

The Timeline tab

Timeline is the task's history, newest first. It loads when you open the tab, so give it a moment.

It records four kinds of event: a status change, a priority change, a post being scheduled, and a post being published. The posting entries name the platforms the post went to.

Each entry says who did it - or System when it was done automatically rather than by a person - and how long ago, counted from now: Just now, so many minutes or hours ago, Yesterday with the time, or a number of days ago with the time. On a task nobody has touched yet it reads that there is no timeline activity.

This is the place to check who moved a task to Completed, and when, if the status is not what you expected.

If something does not work

A few things that commonly catch people out on this screen.

  • The month box at the top right will not let you pick a month - every month but one is greyed out in it. Use Today, the arrows, or the month box inside the calendar card.
  • The day you had selected jumped when you changed month - that is expected. You land on today in the current month, and on the 1st in any other.
  • A task you were told about is nowhere on the calendar - it has no scheduled date, so it cannot be placed on a day. Ask the agency to schedule it.
  • A very busy month looks incomplete - a month loads 100 tasks at a time, and the most recently created are the ones kept.
  • A day shows a big red number and you assume something is late - the red count is just tasks not yet Completed. Lateness shows as a red Due date or a (Delayed) tag on the task card.
  • Clicking a date does not open anything - it only refills the panel on the right. Click the task card itself to open it.
  • The Attachments block is missing on a task you know has files - the day's list does not carry attachments. They appear once the task reloads, which happens after you post a comment on it.
  • Post Comment is greyed out - add some text or at least one image. One or the other is enough.
  • The comment never posts and your text stays in the box - most often an image over 5 MB, more than 10 files, or a format other than JPG, PNG or WEBP. It also happens when you changed Set Status on a task whose post is already published or already scheduled.
  • Your image thumbnails disappeared and nothing posted - the upload was rejected, usually because your agency's storage is full. Nothing you did is wrong; tell the agency.
  • A pasted description lost its formatting - Copy takes the text only, by design.
  • The Set Status box looks empty - the task is at a status that is not one of Hold, Changes or Completed. Leaving it empty posts a plain comment, which is normally what you want.
  • You changed a status by accident - you cannot undo it here. Post a comment saying so; the Timeline tab shows exactly what changed and when.
  • Every month comes up empty although the agency says there is work - your login may not be linked to your client record yet. That is something only the agency can fix.